Basement Finishing Cleveland, OH – Olmsted Falls Basement Design

JM Design Build, one of the premier general contractors in Cleveland, recently finished a basement in Olmsted Falls, Ohio. The Basement includes a half bath, full bar, entertainment area, playroom, and more. The design below shows what was developed for the Olmsted Falls Basement finishing project. Don’t be afraid to tell us what you think about it on this blog!

Basement Finish with Full Bar Basement Finish Olmsted Falls OH Basement Finish with Half Bath Basement Finish with Custom Handrail

Basement Finishing & Design Overview

The homeowners were looking to utilize their space and entertain friends and family, so the JM Design Build team decided to deliver. The team was able to bring the idea to life by working closely with the homeowners on their planned requirements.

Basement Specifications & Details

The Basement Finishing project took about 6 weeks and improved the house dramatically. It’s amazing how a large, unused area can be transformed to one of the shining spots of your home, while also staying within your budget.

As you can see the pictured elements from the basement above, the bar features finely crafted countertops from Counter Concepts. These top quality countertops were built exactly to the customer’s expectations.

Also featured are quality wood hand railings and spindles, completed by our team and supplied by the Home Depot. Lastly, a new ½ bathroom, installed with ceramic tiling, drywall, a handsome mirror, a cabinet, and you can’t forget, the toilet a la mode.

Project Scope

  1. Framed approximately 31’ X 34’ area
  2. Framed for unfinished area around furnace/hot water tank and sump
  3. Framed for new ½ bath
  4. Framed for storage areas underneath stairway and closet in front of stairs
  5. Built soffits around beams, poles and mechanicals/HVAC
  6. Installed R-13 insulation on all perimeter walls
  7. Installed and updated all electrical to service new area to code including 14 recess lights, new switches and outlets
  8. Dry walled all walls and ceilings in ½ bath and all finished areas
  9. Mudded, sanded, taped, primed and painted all drywall with one coat (owner’s choice)
  10. Updated plumbing and electric to service new bathroom to code
  11. Installed all new fixtures in ½ bath including toilet, sink, mirror, etc.
  12. Installed ceramic tile on bathroom floor
  13. Installed new doors to access bath, sump, and furnace; installed bi-fold door into closet area
  14. Installed standard trim as needed
  15. Installed handrail and spindles on stairway

Basement Finishing in Cleveland, Ohio

JM Can refinish your basement and stay within your budget. Contact Us today for a free design consultation.

This entry was posted in Basement Remodeling and tagged , , , . Bookmark the permalink.